Port Glasgow Carpark
- Soil strip of site, funding all material for reuse
- Bulk excavation to formation level, using excavated material to form bunds along outside perimeter of site
- Install soakaway drainage for self draining parking bays, including connection into culvert
- Lay road kerb to perimeters of carpark and parking bays
- Line parking bays with geo-textiles and geo-grid and fill with clean granular material
- Lay plastic paving grid system and fill with decorative gravel
- Install all street lighting ducts, cables and columns
- Form roads and grade ready for tar