Port Glasgow Carpark

  • Soil strip of site, funding all material for reuse
  • Bulk excavation to formation level, using excavated material to form bunds along outside perimeter of site
  • Install soakaway drainage for self draining parking bays, including connection into culvert
  • Lay road kerb to perimeters of carpark and parking bays
  • Line parking bays with geo-textiles and geo-grid and fill with clean granular material
  • Lay plastic paving grid system and fill with decorative gravel
  • Install all street lighting ducts, cables and columns
  • Form roads and grade ready for tar

image10