Milton of Campsie Housing Development

  • Breaking out factory floor slab and ringbeam/pad foundations to a depth of 2-3m
  • Breaking out 2 brick built industrial chimney bases
  • Working in conjunction with decontamination contractor to remove the contents of two gasometers then the removal of the structure
  • Crushing all material onsite
  • installation of sheet piles to retain gardens to existing houses to allow a timber crib wall to be constructed
  • Installaiton of Foul and Storm sewer network including Storm attenuation system
  • Construction of roads and footpaths
  • All excavations for services including the installation of BT, Virgin Media, street lighting ducts and street lighting columns
  • Mix of strip, trench fill and ring beam foundations
  • All internal/external drainage and services works to plots
  • Construct and pour concrete floor slabs
  • Infill of soft landscaping areas with suitable sub and topsoil
  • Hardlandscaping around plots, works included slabbing, kerbing and mono blocking
  • Grading off banking down into burn and installing vegetation matting to prevent landslips and to encourage vegetation grown on the banking
  • Laying specially specified regular block to selected panels of the road