Breaking out factory floor slab and ringbeam/pad foundations to a depth of 2-3m
Breaking out 2 brick built industrial chimney bases
Working in conjunction with decontamination contractor to remove the contents of two gasometers then the removal of the structure
Crushing all material onsite
installation of sheet piles to retain gardens to existing houses to allow a timber crib wall to be constructed
Installaiton of Foul and Storm sewer network including Storm attenuation system
Construction of roads and footpaths
All excavations for services including the installation of BT, Virgin Media, street lighting ducts and street lighting columns
Mix of strip, trench fill and ring beam foundations
All internal/external drainage and services works to plots
Construct and pour concrete floor slabs
Infill of soft landscaping areas with suitable sub and topsoil
Hardlandscaping around plots, works included slabbing, kerbing and mono blocking
Grading off banking down into burn and installing vegetation matting to prevent landslips and to encourage vegetation grown on the banking
Laying specially specified regular block to selected panels of the road