Milton of Campsie Housing Development
- Breaking out factory floor slab and ringbeam/pad foundations to a depth of 2-3m
- Breaking out 2 brick built industrial chimney bases
- Working in conjunction with decontamination contractor to remove the contents of two gasometers then the removal of the structure
- Crushing all material onsite
- installation of sheet piles to retain gardens to existing houses to allow a timber crib wall to be constructed
- Installaiton of Foul and Storm sewer network including Storm attenuation system
- Construction of roads and footpaths
- All excavations for services including the installation of BT, Virgin Media, street lighting ducts and street lighting columns
- Mix of strip, trench fill and ring beam foundations
- All internal/external drainage and services works to plots
- Construct and pour concrete floor slabs
- Infill of soft landscaping areas with suitable sub and topsoil
- Hardlandscaping around plots, works included slabbing, kerbing and mono blocking
- Grading off banking down into burn and installing vegetation matting to prevent landslips and to encourage vegetation grown on the banking
- Laying specially specified regular block to selected panels of the road